Precision Fiber Optics is a fiber optic splicing company.  We install fiber optic cases and components for the completion or upgrade of a fiber projects, which can include FTTx, Short and Long projects, Fiber route design with database to document, Cut Over to new cable from existing and troubleshooting fiber breaks and losses are just some of the example of the quality services we provide.
Precision Fiber Optics was established in 2007.  And although we are a new company some of our experienced Fiber Technicians, have been in the Fiber Optics industry for a more than 8plus years.  Dealing with many fiber to the curb, PON and home projects, CISCO Ring, Hot or Live Cut cable moves and restorations.   Below is a list of some projects our head Fiber Optic Techs have completed on their own or helped lead to completion.
 

Fiber To The x(home, remote,etc)

DVC00406.JPG

Fiber Optic Cases

DVC00399.JPG

Central Office Splicing

Blanca_AFC_closed.JPG

Project Experience

Cut_sheet_splash_form.jpeg

RT COMMUNICATION, Worland, WY

RT Communication (2008)

Locations Work Preformed In:Worland, WY  ( 2 PON large fiber counts 200 plus and 1 Splitter in the field locations )
Type of Work Preformed: FTTh & FTTc projects (new and existing), case preparation and fusion splicing, AFC fiber setup and splicing, Hot Cut,  PON cabinet fiber setup and splice, replace or update of existing case, working fiber splices, bare fiber bi-directional testing OTDR and power meter, troubleshooting, repair and documentation of broken or unknown fiber locations.

Approximate Total Number of Case Worked on(Tyco & Coyote): 
150-200+  (includes working and new cases)

Approximate Total Number of Splice Working and Non (Fusion Splice):
   2000+ splices

Century Telephone (2006-2007)

Locations Work Preformed In:  Avon, CO, Edwards, CO, Eagle, CO, Gypsum, CO, Walsh, CO, Akron, CO, Pagosa Springs, CO, Dolores, CO

Type of Work Preformed: 
FTTh & FTTc projects (new and existing), case preparation and fusion splicing, AFC fiber setup and splicing, Hot cuts and cable cut overs, Central Office fiber cabinet set up and splicing, PON cabinet fiber setup and splice, replace or update of existing case, working fiber splices, bi-directional testing OTDR and power meter, troubleshooting, repair and documentation of broken or unknown fiber locations.

Approximate Total Number of Case Worked on(Tyco & Coyote): 
300+  (includes working and new cases)

Approximate Total Number of Splice Working and Non (Fusion Splice):
   2000+ splices

Main menu of our cut sheet software
webassets/Cut_Sheet_menu_Form.JPG

Blanca Telephone (2006-2007)

Locations Work Preformed In:  Blanca, CO, Ft Garland, CO and Wagon Creek (Forbes Park)

Type of Work Preformed:  FTTh, Splitting fibers in the field, installing splitter moduals in tyco cases(1x16,1x2,1x4, 1x32), AFC splice and setup, Central Office cabinet setup and splice, OTDR testing, Power Meter and Network Interface Device setup and splice at 200 plus homes.

Approximate Total Number of Case Worked on(Tyco&Coyote):  150+  (includes working and new cases installations)

Approximate Total Number of Splice Working and Non (Fusion Splice):  +1500

Fiber Optic Troubleshooting Specialist

    ***  Precision Fiber Optics technicians has also solved many fiber optic problems for customers:
     1.   Unite Private Networks (Pueblo, CO District 60 school ring)
     2.   Century Tel (Akron, CO Feed Fibers)
     3.   Century Tel (Stratton, CO Feed fibers between Central Offices)
     4.   3 Rivers (Big Sky, MT Feed fibers between LCC and CO).
     5.   Primetime Communication (Elizebeth, CO drop fiber to the house).
     6.   And Blanca Telephone (Alamosa, CO)

Just to mention a few.
 
    

Click to enlarge
DVC00412.JPG

Central Montana Communications, 3 Rivers Communication 2006-2007

Locations Work Preformed In:
  Ft Belknap, Dodson, Big Sky(Yellowstone),

Type of Work Preformed:  FTTh, AFC splice and Setup, Remote Cabinet Setup and splice, OTDR Testing Bi directional and Power Meter testing.

Approximate Total Number of Case Worked on(Tyco&Coyote):  100+ Cases

Approximate Total Number of Splice Working and Non (Fusion Splice):  +1500 Splices

DVC00701.JPG
Live Cable Move Project

Rye Telephone 2003-2007

Locations Work Preformed In:
  Colorado City, Rye (Colorado)

Type of Work Preformed:  PON Cabinet 1x32 splitter, Home Network Interface Device installation(NID) setup and splice, (approximately 1000 plus homes) OTDR Test and Power Meter for documentation.

Approximate Total Number of Cases Worked on(Coyote/Preform):  300 plus, including drops to houses (includes working and new cases installations), 15+ PON Hub cabinet spliced, tested and or setup (each PON Hub fiber distribution range 120 fibers to 192 fibers plus 24 fiber feed).

Approximate Total Number of Splice Working and Non (Fusion Splice):  3000 plus splices